{"id":67550,"date":"2017-02-23T09:40:54","date_gmt":"2017-02-23T07:40:54","guid":{"rendered":"https:\/\/baupanel.tech\/expansion-the-parish-church-malaga-construction\/"},"modified":"2023-05-09T12:38:02","modified_gmt":"2023-05-09T10:38:02","slug":"expansion-the-parish-church-malaga-construction","status":"publish","type":"post","link":"https:\/\/baupanel.tech\/en\/expansion-the-parish-church-malaga-construction\/","title":{"rendered":"Extension of Parish in Malaga"},"content":{"rendered":"<div class=\"wpb-content-wrapper\"><p>[vc_row margin_top=&#8221;40px&#8221; margin_bottom=&#8221;30px&#8221;][vc_column][vc_row_inner][vc_column_inner][vc_column_text css=&#8221;.vc_custom_1571327119532{padding-bottom: 20px !important;}&#8221;]<\/p>\n<h2>Building Expansion: Santo Tom\u00e1s de Aquino Parish<\/h2>\n<p>[\/vc_column_text][\/vc_column_inner][\/vc_row_inner][\/vc_column][\/vc_row][vc_row margin_bottom=&#8221;25px&#8221;][vc_column][vc_row_inner][vc_column_inner width=&#8221;1\/4&#8243;][vc_single_image image=&#8221;45468&#8243; img_size=&#8221;full&#8221; alignment=&#8221;center&#8221;][vc_single_image image=&#8221;45456&#8243; img_size=&#8221;full&#8221; alignment=&#8221;center&#8221;][vc_single_image image=&#8221;45464&#8243; img_size=&#8221;full&#8221; alignment=&#8221;center&#8221;][\/vc_column_inner][vc_column_inner width=&#8221;3\/4&#8243;][vc_column_text css=&#8221;.vc_custom_1571327233799{padding-bottom: 20px !important;}&#8221;]The Santo Tom\u00e1s de Aquino Parish was inaugurated in 1976 on Salvador Dal\u00ed Street No. 3 in the populous Martiricos neighborhood of the city of Malaga.<\/p>\n<p>It consists of a simple nave with a gabled roof and dimensions of 10 meters wide by 35 meters long and 5 meters high.[\/vc_column_text][vc_column_text css=&#8221;.vc_custom_1683626802021{padding-bottom: 25px !important;}&#8221;]In 2015, the Bishopric of Malaga, at the request of the parish priest D. Juan Manuel Gonz\u00e1lez Ru\u00edz, began to study the expansion of the parish with the idea of having a new necessary space that would allow meetings of up to 200 people and a dining room with capacity for some 50 persons.<\/p>\n<p>From an architectural point of view, it was decided that the new work should repeat the current design of the parish with its gabled nave and similar dimensions.<\/p>\n<p>The expansion works were initially conceived using traditional construction techniques, with a reinforced <a title=\"What is the slab foundation?\" href=\"https:\/\/baupanel.tech\/en\/?p=67511\">concrete foundation slab<\/a>, an independent metal structure, exposed plastered brick walls and a sandwich panel roof with transversal reinforcements to support mobile walls with a weight of 1600 kg. .[\/vc_column_text][\/vc_column_inner][\/vc_row_inner][vc_empty_space height=&#8221;30px&#8221;][vc_column_text]Both the architect author of the project, Architect D. Ricardo Medina Bujalance, and Architect D. Pablo Casesnoves Campodarve, head of the technical office of the Bishopric of M\u00e1laga, agreed that the Baupanel construction system would be ideal, not only from a structural point of view, but also It would also provide the necessary thermal insulation required by the parish priest, for the greater comfort of the parishioners, reducing the need for thermal conditioning.<\/p>\n<h3>Construction system assembly sequence<\/h3>\n<p>The start of the assembly of the system is carried out on August 29, 2016.[\/vc_column_text][\/vc_column][\/vc_row][vc_row margin_bottom=&#8221;25px&#8221;][vc_column][vc_row_inner css=&#8221;.vc_custom_1571381080696{padding-bottom: 25px !important;}&#8221;][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;45480&#8243; img_size=&#8221;full&#8221; alignment=&#8221;center&#8221;][\/vc_column_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;45452&#8243; img_size=&#8221;full&#8221; alignment=&#8221;center&#8221;][\/vc_column_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;45488&#8243; img_size=&#8221;full&#8221; alignment=&#8221;center&#8221;][\/vc_column_inner][\/vc_row_inner][vc_column_text]In two weeks all the walls of the parish were assembled as can be seen in the following images captured on September 16. The placement of some 500 m2 of panels almost 5 m high had been carried out with a small crew of only 3 operators.<\/p>\n<p>Before 3 weeks of work were completed, the roof was already being assembled as can be seen in the following images from September 20[\/vc_column_text][vc_column_text]Before 3 weeks of work were completed, the roof was already being assembled as can be seen in the following images from September 20[\/vc_column_text][\/vc_column][\/vc_row][vc_row margin_bottom=&#8221;25px&#8221;][vc_column width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;45420&#8243; img_size=&#8221;full&#8221; alignment=&#8221;center&#8221;][\/vc_column][vc_column width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;45432&#8243; img_size=&#8221;full&#8221; alignment=&#8221;center&#8221;][\/vc_column][vc_column width=&#8221;1\/3&#8243;][vc_column_text]The presence of the beams made with the panel with a free span between supports of almost 10 meters can be highlighted.[\/vc_column_text][vc_column_text]The reinforcement of these beams is calculated in a similar way to a traditional reinforced concrete beam, but with the great advantage that its own weight is 70% less.[\/vc_column_text][\/vc_column][\/vc_row][vc_row margin_bottom=&#8221;25px&#8221;][vc_column][vc_column_text css=&#8221;.vc_custom_1571328287142{padding-bottom: 20px !important;}&#8221;]The pneumatic projection works of the walls and roof were completed on October 21, 2016, that is to say that after 7 weeks from the beginning the gray work had been completed and the parish was already in the beginning phase of the finishes.[\/vc_column_text][vc_row_inner][vc_column_inner width=&#8221;1\/6&#8243;][vc_single_image image=&#8221;45440&#8243; img_size=&#8221;full&#8221; alignment=&#8221;center&#8221;][\/vc_column_inner][vc_column_inner width=&#8221;1\/6&#8243;][vc_single_image image=&#8221;45448&#8243; img_size=&#8221;full&#8221; alignment=&#8221;center&#8221;][\/vc_column_inner][vc_column_inner width=&#8221;1\/6&#8243;][vc_single_image image=&#8221;45412&#8243; img_size=&#8221;full&#8221; alignment=&#8221;center&#8221;][\/vc_column_inner][vc_column_inner width=&#8221;1\/6&#8243;][vc_single_image image=&#8221;45484&#8243; img_size=&#8221;full&#8221; alignment=&#8221;center&#8221;][\/vc_column_inner][vc_column_inner width=&#8221;1\/6&#8243;][vc_single_image image=&#8221;45476&#8243; img_size=&#8221;full&#8221;][\/vc_column_inner][vc_column_inner width=&#8221;1\/6&#8243;][vc_single_image image=&#8221;45416&#8243; img_size=&#8221;full&#8221; alignment=&#8221;center&#8221;][\/vc_column_inner][\/vc_row_inner][\/vc_column][\/vc_row][vc_row][vc_column width=&#8221;1\/3&#8243;][vc_column_text]<\/p>\n<h3>Foundation<\/h3>\n<p>A very important particularity of this work was the great savings obtained in the <a title=\"What is the slab foundation?\" href=\"https:\/\/baupanel.tech\/en\/?p=67511\"><strong>foundation works.<\/strong><\/a> Indeed, the original project provided for a deep foundation made with 18 m deep <strong>reinforced concrete<\/strong> piles on which a 50 cm thick slab would rest.<\/p>\n<p>By using the <a title=\"What is the slab foundation?\" href=\"https:\/\/baupanel.tech\/en\/?p=67511\"><strong>Baupanel\u00ae System<\/strong><\/a> construction system, piling could be avoided and all that was needed was an improvement of the ground by means of soil-cement columns only 5.50 m deep with a reinforced concrete slab 25 cm thick (half that of the projected slab).<\/p>\n<p>Illustrated below are the results of the two penetrometers (superheavy dynamic penetration DPSH)<\/p>\n<p>The comparative economy obtained has been more than 75% and this frequently occurs when using this <strong>construction technology.<\/strong>[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;45428&#8243; img_size=&#8221;full&#8221; css=&#8221;.vc_custom_1571380851861{padding-bottom: 20px !important;}&#8221;][vc_column_text]This is mainly due to three determining factors provided by the <a title=\"Baupanel\u00ae System \u2013 Building Systems\" href=\"https:\/\/baupanel.tech\/en\/efficient-building-system-baupanel\/\"><strong>Baupanel\u00ae System:<\/strong><\/a><\/p>\n<ul>\n<li>Reduction of more than 50% of the own weight with respect to the original project solution. This circumstance allowed the foundation with a tension in the support plane of only 0.37 Kg\/cm2. Keep in mind that this stress value is lower than the admissible stress of a fluid clayey soil (0.5 Kg\/cm2).<\/li>\n<\/ul>\n<p>[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/3&#8243;][vc_column_text]<\/p>\n<ul>\n<li>The stiffening of the <a title=\"What is the slab foundation?\" href=\"https:\/\/baupanel.tech\/en\/?p=67511\"><strong>foundation slab<\/strong><\/a> is carried out by the walls that support it. Unlike the masonry walls, which are deformable elements, the walls of the construction system are elements of <strong>reinforced concrete<\/strong>, lightened by the gap occupied by the insulating element, but with a very high flexural rigidity E x I; Given that in our case the walls have a height of 5 m, the rigidity value is greater than 218,000 Tm2.<\/li>\n<li>The charges reach the ground in a distributed manner. As there are no pillars, the concrete slabs that support the constructions carried out with the construction system do not require any kind of specific reinforcements in coincidence with the loads, nor are they required to increase the edge on the edges to form perimeter bands, since the The wall itself that attacks materializes it.<\/li>\n<\/ul>\n<p>[\/vc_column_text][\/vc_column][\/vc_row][vc_row margin_bottom=&#8221;25px&#8221;][vc_column][vc_column_text css=&#8221;.vc_custom_1683627409148{padding-bottom: 20px !important;}&#8221;]<\/p>\n<h3>Foundation<\/h3>\n<p>A very important particularity of this work was the great savings obtained in the foundation works. Indeed, the original project provided for a deep foundation made with 18 m deep reinforced concrete piles on which a 50 cm thick slab would rest.<\/p>\n<p>By using the <a title=\"Baupanel\u00ae System \u2013 Building Systems\" href=\"https:\/\/baupanel.tech\/en\/efficient-building-system-baupanel\/\"><strong>Baupanel\u00ae System construction system<\/strong><\/a>, piling could be avoided and all that was needed was an improvement of the ground by means of soil-cement columns only 5.50 m deep with a reinforced concrete slab 25 cm thick (half that of the projected slab).<\/p>\n<p>Illustrated below are the results of the two penetrometers (superheavy dynamic penetration DPSH)[\/vc_column_text][vc_row_inner css=&#8221;.vc_custom_1571380943192{padding-bottom: 20px !important;}&#8221;][vc_column_inner width=&#8221;1\/2&#8243;][vc_single_image image=&#8221;45436&#8243; img_size=&#8221;full&#8221; css=&#8221;.vc_custom_1571380905892{padding-bottom: 20px !important;}&#8221;][\/vc_column_inner][vc_column_inner width=&#8221;1\/2&#8243;][vc_single_image image=&#8221;45444&#8243; img_size=&#8221;full&#8221;][\/vc_column_inner][\/vc_row_inner][vc_column_text css=&#8221;.vc_custom_1683627300965{padding-bottom: 20px !important;}&#8221;]Views of the slab \u2013 <a title=\"What is the slab foundation?\" href=\"https:\/\/baupanel.tech\/en\/?p=67511\"><strong>foundation slab<\/strong><\/a> of the building with the panels connected[\/vc_column_text][vc_row_inner css=&#8221;.vc_custom_1571380943192{padding-bottom: 20px !important;}&#8221;][vc_column_inner width=&#8221;1\/4&#8243;][vc_single_image image=&#8221;45472&#8243; img_size=&#8221;full&#8221;][\/vc_column_inner][vc_column_inner width=&#8221;3\/4&#8243;][vc_column_text]The repercussion of the savings in foundations in cases like the one analyzed or similar can be between \u20ac100 and \u20ac150 per square meter of built work.<\/p>\n<p>In addition to this advantage, it must be considered that there will also be significant savings in the execution period and that the building will be eligible for the highest energy ratings at no added cost.<\/p>\n<p>Interesting alternative to the traditional system, right?[\/vc_column_text][\/vc_column_inner][\/vc_row_inner][\/vc_column][\/vc_row]<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>The Santo Tom\u00e1s de Aquino Parish was inaugurated in 1976 on Salvador Dal\u00ed Street No. 3 in the populous Martiricos neighborhood of the city of Malaga.<\/p>\n","protected":false},"author":2,"featured_media":45492,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[226,546],"tags":[280,586,589,282,584,585,309,284,588,587,283],"class_list":["post-67550","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-baupanel-news","category-construction","tag-baupanel-en","tag-church","tag-church-en","tag-estructurales-en","tag-foundation","tag-malaga-spain","tag-obra-en","tag-paneles-en","tag-slab","tag-structure","tag-estructuras-en","category-226","category-546","description-off"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/baupanel.tech\/en\/wp-json\/wp\/v2\/posts\/67550","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/baupanel.tech\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/baupanel.tech\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/baupanel.tech\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/baupanel.tech\/en\/wp-json\/wp\/v2\/comments?post=67550"}],"version-history":[{"count":3,"href":"https:\/\/baupanel.tech\/en\/wp-json\/wp\/v2\/posts\/67550\/revisions"}],"predecessor-version":[{"id":67553,"href":"https:\/\/baupanel.tech\/en\/wp-json\/wp\/v2\/posts\/67550\/revisions\/67553"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/baupanel.tech\/en\/wp-json\/wp\/v2\/media\/45492"}],"wp:attachment":[{"href":"https:\/\/baupanel.tech\/en\/wp-json\/wp\/v2\/media?parent=67550"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/baupanel.tech\/en\/wp-json\/wp\/v2\/categories?post=67550"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/baupanel.tech\/en\/wp-json\/wp\/v2\/tags?post=67550"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}